RO-LITE COMMERCIAL SYSTEM INSTALLATION INSTRUCTION & OWNER’S MANUAL Ver 2.3ULTIMATE REVERSE OSMOSIS SYSTEMAll Rights Reserved © APEC Water System
64. Test for leaks at this point: Close the Ball Valve by turning the “handle” to the vertical position, this will shut-off the feed water. Then, turn
72. See Fig. 4. Mark the position of the hole on the drain pipe and drill a 1/4” hole through one side of the drain pipe. There is a piece of self-adh
8Step 3: Drilling A Hole For The RO FaucetThe RO dispensing faucet can be mounted on the sink, on the counter top, or simply hang at a location where
93. For Porcelain Sink: Porcelain enameled sinks can readily be chipped if care is not exercised when drilling the hole. Before starting the drill
10Step 5: Positioning The SystemThe RO system can stand on the ground or be secured to the wall. The storage tank may be laid on its side if needed. T
111. Point Z Faucet connections:Tubing color: Clear tubing. Connect the 3/8” CLEAR tubing to the base of the RO faucet. Fitting type: Quick-Connec
127. Point Y Tank’s input & output connection:Tank Shut-Off Valve Kit: The tank-shut off kit includes 2 parts. A Shut-off valve and a Tank Output
13Step 7: System Start-Up1. Turn on feed water: Slowly, turn on your cold water supply. Open the Feed Water Ball Valve to allow the raw water to e
14FILTER CHANGE SCHEDULEThe system requires very little maintenance. Just change the filter cartridges regularly as suggested below. Keep the system s
15FILTER CHANGE INSTRUCTIONSHow To Replace Stages 1, 2, 3 Pre-Filters:1. Turn OFF cold water supply to RO system. Turn OFF tank’s ball-valve. Lift
16How to Replace Stage-4 Membrane:There are several membranes (2 to 4 depending on model) provided with your system. Please insert the membrane into e
17How to Replace Last Stage Post Carbon Filter:Replace this last filter at the same time you replace the stage-4 membrane. 1. Locate the last stag
18OWNER’S MANUALThis section provides explanation and basic concepts on how an RO system works, and how it performs in relation to your input water’s
194). How Long Does It Take to Fill Tank?Depending on your water pressure and RO model, the standard tank will fill up in about 2-3 hours. After the
208). How to Test Your Water Pressure:Get a water pressure gauge that adapts onto your sink or garden faucet (from hardware store), attach gauge onto
2111). Premature Membrane Failure:There are 4 common causes that lead to premature membrane failure:1) Failing to replace the 3 pre-filters as fre
22LIMITED PRODUCT WARRANTYScopeAPEC takes pride in selling a superb line of products, including this reverse osmosis system (“Product”). As such, APE
CONDITIONS THAT RENDER THIS LIMITED PRODUCT WARRANTY VOIDTHIS LIMITED PRODUCT WARRANTY SHALL BE VOID IF:1. The Product is not operated in compliance w
Advanced Purification Engineering Corp.1320 S Johnson DriveCity of Industry, CA 91745For questions or comments please visit our website at:FreeDrinkin
Please keep this Owner’s Manual for future reference. It contains helpful information on how to maintain and care for yourAPEC Reverse Osmosis water f
Please read and become familiar with instructions and parts needed before pro-ceeding with the installation.BEFORE INSTALLATION: Inspect the system:
1Components included with the Ro system:1 RO system 3 Pre-filters in 3 Housings 1 Storage tank 2 - 4 RO membranes (depends on model) Pre inserted inme
2Component Itemization:#1) Bracket#2) Membranes inside their housings#3) In-line carbon filter (last-stage filter)#4) Sediment pre-filter and housing
3Fitting Types:The Ro Lite Commercial System comes standard with Quick-Connect (QC) Fittings.Quick-Connect (QC) Fittings: (no insert, sleeve, or nut),
4INSTALLING THE SYSTEM*All filters are already pre-installed inside their housings, please follow the installation steps listed below. The Ro Lite Com
53. Ball Valve: See Fig. 2 Screw the Ball Valve onto the Adapter tightly. Apply 5-6 rounds of Teflon tape onto Ball Valve before attaching it to the A
Comments to this Manuals