ULTIMATE REVERSE OSMOSIS SYSTEMINSTALLATION INSTRUCTION& OWNER’S MANUALAll Rights Reserved © APEC Water SystemsVer 3.1
7Fig. 5A - Needle Valve Installation.Attach the needle valve (C) to water supply adapter (A). Please apply 5-6 wraps of teflon tape to needle valve pr
8RiserTubeFor Flexible LineFaucetShankMain WaterSupply Shut-offValveRiserTubeFor Solid LineFaucetShankFeed WaterAdaptorFeed WaterAdaptorMain WaterSupp
9Fig. 6C4. Needle Valve: See Fig. 6C. Screw the Needle Valve onto the Adaptor tightly. Apply 6-8 rounds of Teflon tape onto Needle Valve before att
10MOUNT DRAINSADDLE ATEITHER LOCATIONStep 2: Drain Saddle InstallationNote: To avoid annoying drainage noise, mount drain line as low as possible
11Step 3: Drill A Hole For The RO Faucet Drill 1/2” diameter hole for standard RO faucet. (Air-Gap faucet: drill 1&1/4” hole.)For best result
12Black Locating WasherLock WasherLock NutFaucet AdapterTubingCounter TopCounter Top OpeningChrome BaseStep 4: Mounting The Faucet1. Mount the fauce
13Step 6: Connecting The System Summary of Tubing Connections: There are 4 connections: See Fig 11 and 11APoint A to X: Connect RO to COLD wat
14Fig. 11ADetails on Tubing Connections: To ensure a smooth and correct installation, please connect the water lines following the se-quence and or
153. Point W Waste water connection:Tubing color: Black tubing. Connect the BLACK tubing from the RO to the Drain Saddle.Fitting type: Quick-Con
16Ball Valve(Recommended)Tee tting for icemaker7. Point Y Tank’s input & output connection:Prepare tank: See Fig.12. Apply 6-8 wraps of Tef
17Using RO for Ice-maker only: If you want the RO to feed your ice-maker (fridge) only, you should still connect the RO faucet as a 2nd outlet. This
Please keep this Owner’s Manual for future reference. It contains useful information on how to maintain and care for your APEC Reverse Osmosis water f
1Thank you for choosing APEC reverse osmosis systems. You now own the finest water filter in America. Please read and become familiar with instruction
2Components included with the RO system:Make sure you have all these parts before starting installation.1 RO system headwith pre installed membrane3 P
3Component Itemization:1) Sediment pre-filter and housing (1st-stage filter)2) Carbon block pre-filter and housing ( 2nd-stage filter)3) Carbon blo
42. Metal compression nut fitting: (comes with 1 insert, 1 sleeve, 1 nut) Only feed water a
5THERE ARE TWO PARTS TO INSTALLING THE RO SYSTEM: Part I. Assemble the filters and housings onto the main systemPart II. Installing the systemNote:
6PART II. INSTALLING THE SYSTEMSpace: Make sure there is sufficient space under the counter for installation (an area of about 17”L x 6”W x 18”H for
Comments to this Manuals